
St George Mining Ltd (ASX:SGQ, FRA:S0G, OTC:SGQMF) has delivered its thickest and most compelling drill result yet from the Araxá Rare Earths and Niobium Project in Brazil, with a standout intercept of 178.7 metres at 4.34% total rare earth oxides (TREO) and 0.75% niobium oxide (Nb₂O₅) from surface.
The result — the thickest mineralised interval recorded at Araxá to date — underscores the scale, grade and near-surface continuity of the deposit, reinforcing its status as one of the most significant undeveloped rare earths and niobium projects globally.
It forms part of a broader batch of assay results from 15 diamond drill holes, with multiple wide, high-grade intercepts continuing to demonstrate consistency across the system.
Oblique section showing the latest diamond drill holes as well as other significant drilling completed in the current campaign. The latest drill holes with red labels.
Among the highlights:
-
165.3m at 4.28% TREO and 0.61% Nb₂O₅ from surface
-
150.2m at 4.64% TREO and 0.59% Nb₂O₅ from surface
-
163.65m at 3.29% TREO and 0.45% Nb₂O₅ from surface
-
81.05m at 5.14% TREO and 0.64% Nb₂O₅ from surface
These results continue to highlight a defining feature of Araxá — very thick, high-grade mineralisation starting at surface, supporting the potential for a low-strip, open-pit mining operation.
Section A – A’ showing high-grade TREO intercepts (cut-off 1% TREO) and high-grade Nb2O5 intercepts (cut-off 0.2% Nb2O5) along with the existing MRE outline.
Executive chairman John Prineas said the combination of scale and grade, particularly from surface, sets Araxá apart from comparable projects.
“The drilling results continue to show huge true widths from surface paired with very high grades,” he said.
“This unique combination is unrivalled among emerging rare earths and niobium developers,” he added. “The commercial advantage of high-grade mineralisation starting from surface — as opposed to 50 metres or even more than 100 metres below surface — cannot be underestimated.”
Section B – B’ showing high-grade TREO intercepts (cut-off 1% TREO) and high-grade Nb2O5 intercepts (cut-off 0.2% Nb2O5) along with the existing MRE outline, showing the expansion of the existing MRE.
High-grade system continues to expand
Drilling at Araxá has now been running continuously for more than six months, with the current program designed to both expand and upgrade the mineral resource estimate.
The latest results demonstrate strong grade continuity over broad intervals and suggest further upside, with the mineral system remaining open in all directions and at depth.
latest_posts
- 1
Figure out How to Pick the Right Dental specialist for Your Dental Inserts - 2
Germany's Bundestag extends two armed forces missions abroad - 3
The Strait of Hormuz Isn’t Just an Oil Problem, It’s Now a Food Problem - 4
FACT FOCUS: Trump sows confusion on number of childhood vaccinations - 5
CDC advisory panel delays vote on hepatitis B vaccines after unruly meeting
5 Great Crossover Vehicles For Eco-friendliness In 2024
Huge solar flare no threat to Artemis 2 astronaut launch to the moon, NASA says
Artemis 2 astronauts head for the moon after make-or-break engine burn (video)
Independence from the rat race: How to Save and Contribute Shrewdly
The most effective method to Pick the Right Old Consideration Administration: Key Contemplations
Climbing Mount Everest: An Individual Victory
5 VIP Voice Exhibitions in Energized Movies
7 Powerful Techniques to Boost Efficiency with Your Cell Phone: A Far reaching Guide
UN experts urge investigation into Israel’s killing of Lebanese journalists












